Buvttadeaddji 1986 rájes
Hi Rib Lath Expanded Metal Galvanized Sheet Mesh Hi Rib
Málle nr: HJGB-12

Hei Rib Lath Expanded Metal Galvanised Sheet Mesh Hi Rib

1. Materiála: Galvaniserejuvvon
2. Assái: 0,1-0,6 mm
3. Rievssat:75, 100, 150mm
4. Rievssat: 4mm, 8mm
5. Čuovgga sturrodat: 4,5mmx15mm,5mmx10mm,10mmx20mm,9x20mm,8mmx20mm, 10mmx16mm, 10mmx18mm
6. Viidodat x Guhkkodat: 610x2440mm

Product Description

Introduction of Hi Rib Lath Expanded Metal 

Hi rib lath, mii maiddái gohčoduvvo rib lath dahje high ribbed lath, lea huksenmateriála mii geavahuvvo huksen- ja huksenprošeavttain, erenoamážit go galgá ráhkadit vuođu gips- dahje stukkas seinniide ja čáhcefápmorusttegiidda. Dat lea ráhkaduvvon njuovžilis metállapláhtain, dábálaččat galvaniserejuvvon stállis dahje rusttetmeahttun stállis, ja dan dovdomearka lea ahte das leat bajiduvvon rievssatmállet.


Applications of High Ribbed Lath expanded metal lath metal rih lath

1. Concrete doors and roofs

2. Plaster and cement in the construction of buildings

3. Firewall construction

4. Permanent building external wallsa

5. Landscape sculpture

6. Slope protection, earth embankment engineering ,etc

china expanded metal lath
huijin mesh
galvanized expanded metal lath for sale

Ávkkit alla rievssatlávkkis viiddiduvvon metállalávkkis metállalávkkis

1. It is easy to cut and form the ornamental plaster work 

2. It is commonly used for plaser machine application 

3. It gives a uniform coat depth for large area

4. Ribbejuvvon metállaláhtut leat nanus čatnat, čuohppat ja eará hábmet

5. Good mechanical peroformance

6. Light weight, easy to trasnport and install 

7. Gaskaboddosaččat lea V-lágan rid-neahtta mii dahká viiddiduvvon neahtta fleksibelan. 


Working Principle of Hi Rib Mesh

Go hi-rib-neahtta geavahuvvo bissovaš betonhápmi, de dat dagaha nana vuođu joatkkalaš čáhcebohcciide. Go beton biddjojuvvo skohtermáđiija maŋis, de njuovvanrusttegiid bajiduvvon oasit šaddet betonii. Dát ráhkada mekánalaš čuoikka mii čatná oktii lagaš čuohppanlohkkii, ja sihkkarastá nana čatnama ja čuohppanvuostálasvuođa, ja nu sihkkarastá buori kvalitehta liigečoahkuid.
In secondary concrete pouring, the need for drilling and furring can be eliminated, reducing construction time and enhancing the strength of the concrete. Once the concrete pouring is completed, there’s no need for dismantling. Simply move the support away, saving both time and labor while expediting the construction process.

Please contact for more information of erib lath sheet.

SÁDDET DIEĐÁHUSA